Martha, Jessica (2024) Preliminary Design of a Hexamine Plant with a Capacity of 24000 Tonnes Per Year. Undergraduate thesis, Universitas Bhayangkara Jakarta Raya.
|
Text
201910235019_Jessica Martha_Cover-Daftar Isi.pdf Download (78MB) |
|
|
Text
201910235019_Jessica Martha_BAB I.pdf Download (1MB) |
|
|
Text
201910235019_Jessica Martha_BAB II-XII.pdf Restricted to Registered users only Download (1MB) |
|
|
Text
201910235019_Jessica Martha_BAB XIII.pdf Download (964kB) |
|
|
Text
201910235019_Jessica Martha_Daftar Pustaka.pdf Download (961kB) |
|
|
Text
201910235019_Jessica Martha_Lampiran.pdf Restricted to Repository staff only Download (33MB) |
Abstract
Therefore, the post-tax profit is Rp166,940,393,878. According to the economic evaluation, the estimated plant is low-risk, with an ROI after tax of 27%, a pay-out time (POT) after tax of 3.54 years, a break-even point (BEP) of 41%, and a shut-down point (SDP) of 37%. After thorough analysis, it has been determined that the construction of a hexamethylenetetramine factory with a capacity of 24,000 metric tonnes per year is profitable.
| Item Type: | Thesis (Undergraduate) |
|---|---|
| Additional Information: | Pembimbing: Dr. Tulus Sukreni, S.T., M.T. NIDN0324047505, Bungarang Saing, S.Si., Apt., M.M. NIDN0326027001 |
| Subjects: | Teknologi dan Ilmu Terapan > Teknik Kimia |
| Divisions: | Fakultas Teknik > Teknik Kimia |
| Depositing User: | Mr. Arif Syamsudin |
| Date Deposited: | 11 Jun 2026 02:44 |
| Last Modified: | 11 Jun 2026 02:44 |
| URI: | http://repository.ubharajaya.ac.id/id/eprint/39772 |
Actions (login required)
![]() |
View Item |
Downloads
Downloads per month over past year
