Universitas Bhayangkara Jakarta Raya

Institutional Repositories

Kawi, Rony Octoriza (2016) ANALISIS WAKTU PRODUKTIF OPERATOR PADA PRODUKSI BAJA CANAI DINGIN UNTUK MENINGKATKAN PRODUKTIVITAS DI PT SURABAYA STEEL INVESTAMA. Ristek Universitas Bhayangkara Jakarta Raya.

[img] Text
RONY_JURNAL RISTEK FT_VOL 3_NO 1_MARET 2016.pdf

Download (27MB)

Abstract

Abstrak Operator merupakan pelaku utama dalam suatu proses produksi. Agar suatu perusahaan mencapai produktivitas maksimal, maka operator yang dipekerjakannya pun harus memiliki tingkat produktivitas yang tinggi dalam menghasilkan produk. Tujuan yang ingin dicapai dalam skripsi ini adalah mengetahui persentase waktu kerja produktif dari operator dan mengetahui faktor-faktor yang dapat mempengaruhi tingkat waktu kerja produktif operator di PT Surabaya Steel Investama. Pada proses pengumpulan data digunakan metode Work Sampling yang merupakan metode yang dapat mengukur tingkat produktivitas dari seorang operator dan diagram pareto untuk mengetahui faktor-faktor yang mempengaruhi tingkat produktivitasnya. Hasil penelitian didapatkan dari perhitungan pengolahan data work sampling dan diagram pareto, kemudian dilakukan penghilangan pada aktifitas tidak produktif yang memiliki nilai terbesar. Pada penelitian ini didapatkan hasil waktu siklus sebelum dan setelah diperbaiki, dengan mengadakan penelitian ini maka waktu siklus kerja operator menjadi lebih optimal. Kata Kunci : Operator, Produktivitas, Work Sampling, Waktu Siklus. Abstract Operators are the main actors in a production process. In order for a company to achieve maximum productivity, the operator employed must also have a high level of productivity in producing products. The aim to be achieved in this thesis is to find out the percentage of productive work time from the operator and find out the factors that can influence the level of productive work time of the operator at PT Surabaya Steel Investama. In the process of collecting data used Work Sampling method which is a method that can measure the level of productivity of an operator and pareto diagrams to determine the factors that affect the level of productivity. The results of the study were obtained from the calculation of work sampling data processing and pareto diagrams, then the elimination of unproductive activities which had the greatest value. In this study obtained the results of the cycle time before and after repaired, by conducting this research, the operator's work cycle time becomes more optimal. Keywords: Operator, Productivity, Work Sampling, Cycle Time.

Item Type: Other
Subjects: Teknologi dan Ilmu Terapan > Teknik Industri
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: Rony Octoriza Kawi
Date Deposited: 15 Feb 2021 03:22
Last Modified: 15 Feb 2021 03:22
URI: http://repository.ubharajaya.ac.id/id/eprint/6638

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year