Universitas Bhayangkara Jakarta Raya

Institutional Repositories

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Item Type | No Grouping
Jump to: Thesis
Number of items: 1.

Thesis

Anwar, Nuril (2014) Perhitungan Waktu Baku Pembuatan Baut 14 mm menggunakan Mesin Bubut (Manual) Dengan Metode Work Sampling di Balai Pelatihan Ketenagakerjaan Ganda Agung Bekasi. Undergraduate thesis, Universitas Bhayangkara Jakarta Raya.

This list was generated on Fri Apr 26 20:30:15 2024 WIB.