Universitas Bhayangkara Jakarta Raya

Institutional Repositories

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type | No Grouping
Jump to: D | K | Q | S
Number of items: 6.

D

Daruddin, Daruddin (2002) Pra Rancangan Pabrik Gliserin Kapasitas 20.000 Ton/Tahun. Undergraduate thesis, Universitas Bhayangkara Jakarta Raya.

Dewi, Paranti (2002) Prarancangan Pabrik Formaldehid dengan Kapasitas 40.000 Ton/Tahun. Undergraduate thesis, Universitas Bhayangkara Jakarta Raya.

K

Kurniawanjati, Ari (2002) Pra Rencana Pabrik Aluminium Sulfat dari Bauksit. Undergraduate thesis, Universitas Bhayangkara Jakarta Raya.

Q

Quresman, Addy (2002) Pra Rancangan Pabrik Naphthalene Dengan Kapasitas 15.000 Ton/Tahun. Undergraduate thesis, Universitas Bhayangkara Jakarta Raya.

S

Sudarto, Toto (2002) Pra Rancangan Pabrik Pupuk Triple Super Phospate Kapasitas 245.000 Ton/Tahun. Undergraduate thesis, Universitas Bhayangkara Jakarta Raya.

Supriyanto, Supriyanto (2002) Pra Rancangan Pabrik Benzaldehida Kapasitas 25.000 ton/tahun. Undergraduate thesis, Universitas Bhayangkara Jakarta Raya.

This list was generated on Sun Dec 22 08:58:23 2024 WIB.