Nurseptiani, Fanny (2020) Analisa Biaya dan Waktu Optimal Pemasangan Dinding Luar Beton Pracetak Dengan Menggunakan Metode Time Cost Trade Off (TCTO) (Studi Kasus: Proyek Pembangunan Rumah Susun Penjaringan). Undergraduate thesis, Universitas Bhayangkara Jakarta Raya.

[img] Text
201510215214_Fanny Nurseptiani_Cover-Daftar Isi.pdf

Download (1MB)
[img] Text
201510215214_Fanny Nurseptiani_BAB I.pdf

Download (802kB)
[img] Text
201510215214_Fanny Nurseptiani_BAB II, III, IV.pdf
Restricted to Registered users only

Download (1MB)
[img] Text
201510215214_Fanny Nurseptiani_BAB V.pdf

Download (843kB)
[img] Text
201510215214_Fanny Nurseptiani_Daftar Pustaka.pdf

Download (854kB)
[img] Text
201510215214_Fanny Nurseptiani_Lampiran.pdf
Restricted to Repository staff only

Download (1MB)

Abstract

Analisa metode Time Cost Trade Off (TCTO) dapat menunjukan waktu untuk memulai dan menyelesaikan kegiatan proyek. Dari hasil perhitungan perencana dengan menggunakan metode Bar Chart, kemudian dianalisa dengan metode Time Cost Trade Off (TCTO) yang digunakan peneliti, didapatkan biaya optimal sebesar Rp9.848.610.000 dan durasi penyelesaian pekerjaan selama 95 hari maka efisiensi waktu yang didapat adalah 28 hari kerja atau sekitar 22,76%.

Item Type: Thesis (Undergraduate)
Additional Information: Pembimbing: Zulkani Sinaga, Ir., M.T. NIDN0331016905, Sonny Nugroho Aji, S.T.P., M.T. NIDN0331127304
Subjects: Teknologi dan Ilmu Terapan > Teknik Industri
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: Mr. Arif Syamsudin
Date Deposited: 04 Nov 2025 01:42
Last Modified: 04 Nov 2025 01:42
URI: http://repository.ubharajaya.ac.id/id/eprint/36767

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year