Universitas Bhayangkara Jakarta Raya

Institutional Repositories

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Item Type | No Grouping
Jump to: Thesis
Number of items: 1.

Thesis

Robi, Muhammad (2021) Penjadwalan Waktu Proyek Pembangunan Rumah dengan Mempergunakan CPM (Critical Path Method) serta PERT (Program Evaluation Review Technique) (Studi Kasus Di PT. Bintoro Bangun Indonesia). Undergraduate thesis, Universitas Bhayangkara Jakarta Raya.

This list was generated on Sun Dec 22 10:15:36 2024 WIB.