Universitas Bhayangkara Jakarta Raya

Institutional Repositories

Jamalludin, Asep (2019) Analisis Proses Bongkar Muat Barang dan Pengaruh Penambahan Alat Bantu Dengan Metode Recomended Weight Limit (RWL) (Studi Kasus PT Mensa Binasukses). Undergraduate thesis, Universitas Bhayangkara Jakarta Raya.

[img] Text
201410215109_Asep Jamalludin_Cover-Daftar Isi.pdf

Download (13MB)
[img] Text
201410215109_Asep Jamalludin_BAB I.pdf

Download (1MB)
[img] Text
201410215109_Asep Jamalludin_BAB II, III, IV.pdf
Restricted to Registered users only

Download (2MB)
[img] Text
201410215109_Asep Jamalludin_BAB V.pdf

Download (859kB)
[img] Text
201410215109_Asep Jamalludin_Daftar Pustaka.pdf

Download (974kB)
[img] Text
201410215109_Asep Jamalludin_Lampiran.pdf
Restricted to Repository staff only

Download (4MB)

Abstract

Peneliti menghitung nilai Lifting Index (LI) nilai LI (x) membawa sebesar 0,97<1 dan LI (y) menyusun sebesar 0,97<1 nilai tersebut tidak berpotensi menimbulkan cedera. Usulan ini dapat memangkas waktu dari proses awal sebesar 73,8 menit menjadi 48,5 menit, peneliti dapat memangkas 35% dari waktu awal sekali bongkar muat dan memangkas SDM dari 10 orang sampai 8 orang pekerja bongkar muat menjadi 6 orang sampai 4 orang peneliti dapat memangkas 40% dari SDM awal.

Item Type: Thesis (Undergraduate)
Additional Information: Pembimbing: Ir. Zulkani Sinaga, M.T. NIDN0331016905, Ratna Suminar S., S.T., M.M. NIDN0314047502
Subjects: Teknologi dan Ilmu Terapan > Teknik Industri
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: Mr. Arif Syamsudin
Date Deposited: 27 Nov 2025 01:49
Last Modified: 27 Nov 2025 01:49
URI: http://repository.ubharajaya.ac.id/id/eprint/37018

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year